Building work at Bedford Campus in January
In January building work will be ongoing outside of our Bedford Campus.
During the work temporary traffic lights will be installed at the entrance of the Bedford campus. A traffic management operative will be on site at all times to help manage traffic flow and make any necessary changes to signal timings.
The work dates are below:
8 - 10 January: 08:00 - 18:00
23 - 27 January: 08:00-18:00